NASA'S SPACE SHUTTLE PROCESSING STATUS REPORT: S05-036

Die Arbeiten gehen ihren gewohnten Gang. Von einer Lösung des Eis-Problems scheint man sich wieder entfernt zu haben, da der Versuch ohne PAL-Ramp starten zu wollen, eher nach einem Workaround klingt, denn nach einer fachlichen Lösung.

*****

NASA's space shuttle fleet is housed and processed at Kennedy Space Center, Fla.

Mission: STS-121 - 18th ISS Flight (ULF1.1) - Multi-Purpose Logistics Module
Vehicle: Discovery (OV-103)
Location: Orbiter Processing Facility Bay 3 Launch Date: No earlier than May 2006 Launch Pad: 39B
Crew: Lindsey, Kelly, Sellers, Fossum, Nowak, Wilson and Reiter Inclination/Orbit Altitude: 51.6 degrees/122 nautical miles

Work continues for Discovery's second mission in the Return to Flight sequence, STS-121. The orbiter boom sensor system, the 50-foot device used to inspect the shuttle's heat shield, was installed in Discovery's payload bay on Wednesday. Adjustments of the mechanical release latches will follow in the next few weeks. Inspections of windows 9 and 10 are complete, with no anomalies reported. Wire inspections and chafe protection installation continue on the vehicle's steering jets used in space. The pull tests on the external fuel tank door latch were completed Tuesday.

Technicians continue to replace daily approximately 100 gap fillers in a main-priority area. New installation procedures are being used to ensure the gap fillers stay in place and do not pose a hazard during the shuttle's re-entry to the atmosphere.

Mission: STS-115 - 19th ISS Flight (12A) - P3/P4 Solar Arrays
Vehicle: Atlantis (OV-104)
Location: Orbiter Processing Facility Bay 1 Launch Date: TBD Launch Pad: 39B
Crew: Jett, Ferguson, Tanner, Burbank, MacLean and Stefanyshyn-Piper Inclination/Orbit Altitude: 51.6 degrees/122 nautical miles

Atlantis processing continues on schedule for its mission to the International Space Station. Freon coolant loop no. 1 was drained from the orbiter to allow a cold plate removal and replacement. The forward reaction control system, used for on orbit maneuvers, was installed last week and connections are complete. The mechanical release latches for the shuttle arm are being installed.

Thermal protection system gap-filler inspections and measurements continue in the forward and mid-body areas. Four reaction control system thrusters on the orbiter maneuvering system were replaced.

Endeavour (OV-105)

Technicians continue to process Endeavour in Orbiter Processing Facility Bay 2. Work on the modification of the elevon lightning protection is complete. The modification stabilized the flexible metal casing on the elevon wire harness. Endeavour was powered up on Monday after being down for about two months for wiring modifications.

Installation of the reinforced carbon carbon panels on wing leading edges continues. Technicians installed 15 panels on the left wing and
13 panels on the right wing. Preparation is under way for body flap installation next week. Testing of the vehicle's Global Positioning System took place this week, and hydraulic leak checks began.

External Tank

Engineers continue evaluating the causes of foam loss during Discovery's launch in July. Data has been gathered about the cracks in the protuberance air load (PAL) ramp of external tank 120.
Engineers are focusing on flying the next shuttle mission without the PAL ramp. The removal could affect the ice frost ramp. It is another solid piece of foam like the PAL ramp. It supports the pre-pressurization lines running down the side of the tank adjacent to the PAL ramp. To ensure flight integrity, more testing, including wind-tunnel tests, will be done to identify an engineering solution.
While work continues to target a May launch window, engineers will have more information on scheduling once the engineering fix is selected.
 
mcnoch

mcnoch

Alien
Administrator
Dabei seit
18.04.2003
Beiträge
10.134
Zustimmungen
6.387
Ort
Nürnberg
Ich schließe den Thread jetzt hier mal ab und werde für die kommende Mission einen missionsbezogenen Thread eröffnen. Wenn wieder mal Bedarf an einem allgemeineren Shuttle-Thread besteht, kann dieser ja jederzeit eröffnet werden.
 
Thema:

STS-114 - Discovery "Return to Flight" Shuttle Mission Juli 2005

STS-114 - Discovery "Return to Flight" Shuttle Mission Juli 2005 - Ähnliche Themen

  • GPS Störungen im Ostsee-Raum

    GPS Störungen im Ostsee-Raum: Rätselhafte Störungen des GPS-Signals in der Ostsee – Experten finden Quelle (msn.com)
  • Blackdog.cz - erstmals Zurüstsets für Flugzeuge in 1:32

    Blackdog.cz - erstmals Zurüstsets für Flugzeuge in 1:32: Blackdock bietet seit neuestem Zurüstsets für die A-4 Skyhawk und die A-7 Corsair II im Maßstab 1:32 an, wobei mir z.B. der Buckel der Skyhawk...
  • MPA über Nord- und Ostsee

    MPA über Nord- und Ostsee: https://www.nord24.de/landkreis-cuxhaven/fernsehteam-begleitet-nordholzer-marineflieger-128101.html?fbclid=IwAR15hbsyEl2AruhuFO1gSrYqSRJIe-eFJbP47U...
  • Russische Abfangeinsätze über der Ostsee

    Russische Abfangeinsätze über der Ostsee: was das Air Policing Baltikum für die NATO betrifft - da werden wir immer wieder Meldungen haben. Dass es andersrum auch ein russisches Air...
  • Ausnahmeregelung – Luftraum über Alaska wird für Drohnentests freigegeben

    Ausnahmeregelung – Luftraum über Alaska wird für Drohnentests freigegeben: berichtet soldat-und-technik.de: